少妇精品无码一区二区免费视频_69堂亚洲国产日韩精品无码专区成人妻中文字幕一区二区三区在线久久久久_无套内谢少妇毛片A片樱花

Welcome to [ Wuxi Funecon Precision Mould Plastic Co., Ltd. ] website! Home| Sitemap| Email
Moulding Your Future

Enquiry:

138-6185-1071

138-6185-1071

What are the main aspects of injection mold cooling water leakage

Injection mold cooling water leakage is a frequent occurrence, for many reasons, mainly in the following aspects:
The most occurs at the joint of the mold cooling water pipe. If water leakage is found, the sealing tape should be wound around the thread of the pipe joint and then tightened.
2, Due to long-term molding conditions, the waterproof ring inside the mold will be damaged, and the O-shaped waterproof rubber ring will easily harden and crack, resulting in water leakage. Some poorly installed waterproof rings can also cause seal failure. It is generally necessary to regularly check the installation position and sealing performance of the seal.
3, The hole wall of the cooling water hole is broken. This often happens when a new mold is tried. The wall thickness of the design is sufficient, but the hole wall is broken due to machining errors or post-processing. In most cases, leaking water holes can no longer be used.
4, Regularly repair the heating pipe and decompression pump and use. The heating tube is an effective heat transfer element and is very effective for core cooling of deep and deep structures. In the area where the cooling water is easy to pass, a one-way heating pipe is provided to reduce water leakage. In addition, the use of a vacuum pump to pump cooling water is also a method to prevent leakage of cooling water.
5, maintenance of the cooling water hole. It is easy to form scale in the cooling water hole, which hinders heat transfer. In severe cases, the water path is blocked and needs regular maintenance. For straight water holes, an iron bar that is 0.5 mm smaller than the diameter of the cooling water hole can be inserted and tapped with a hammer to remove scale and rust. For the cooling water pipe buried in the mold, the mold should be disassembled to remove rust.
After the inspection, the water leakage test should be carried out. The hand pressure pump is used to fill the water hole with water, and it is kept at a pressure of 2 MPa for 5 minutes. It is judged whether the water hole leaks by observing whether the water pressure is lowered. The water leakage can be blocked by mechanical fastening using elastic materials such as rubber and cork, and the room temperature curing type silica gel can be tried as a sealing material.
2018/08/02 10:11:16 6611 次

Hot News

Copy right of the 2018 Wuxi Funecon Precision Mould Plastic Co., Ltd. All Rights Reserved

吉林冰雪乌拉城开门迎客 豪掷3.1亿元,增资两家公司,金达莱“跨界”大健康|金达莱 国机精工最新股东户数环比下降13.33% 筹码趋向集中|余额 香港大埔宏福苑火灾遇难者DNA检验工作持续进行 遇难者人数升至161人 中国初步建立全球最大、覆盖品类最全的资源回收和再生利用体系 谁说冬天是淡季?看“鲁大壮”的冬日丰收图鉴! 爱尔眼科“可持续公益”系列报道 入选“2025年企业典型传播案例” 南京证券张之浩呼吁:金融行业和银行、保险行业多交流,共建行业AI生态 俞敏洪再谈董宇辉离职,自嘲成为“道歉哥”|俞敏洪 清仓甩卖、货架空空……万宁闭店前夜,谁在抢购“最后的港妆”? 温州金融监管分局核准王胜锋农业银行温州分行副行长任职资格|温州金融 广百股份12月22日主力大幅流入|广百股份 让未来工厂更聪明:中兴通讯智造大脑方案亮相粤港澳大湾区人工智能与机器人产业大会|中兴通讯 小学生与乒乓球员切磋球技 冠军荣誉墙前种下梦想的种子 8.85 亿收购交割完成!跨界科技赛道|安徽省 加息难改日债日元弱势 日本央行陷入抗通胀与稳经济两难处境|日本央行 2025年企业AI培训学习系统榜单发布:北森AI Learning,重构组织人才发展新范式 基金公司“降温”白银LOF|溢价 22.63亿元主力资金今日撤离传媒板块|传媒 2B企业,正在面临比过去十年都更难的竞争环境|AI OpenAI的组织架构问题如何拖累ChatGPT